DVM processes testplan columns from left to right, for example, the BodePlot test:

*?@ objective source load label loadcomponentvalues
BodePlot(OUTPUT:1) SOURCE(INPUT:1, Nominal) LOAD(OUTPUT:1, 100%) BodePlot lcv/bode_mag_to_grid.txt

LOAD(OUTPUT:1, 100%)

  1. Sets Output Load Current to 100% of Full Load Current Value Taken from DVM Control Symbol

Important!
This entry does NOT change the load subcircuit type.