DVM processes testplan columns from left to right, for example, the BodePlot test:

*?@ objective source load label loadcomponentvalues
BodePlot(OUTPUT:1) SOURCE(INPUT:1, Nominal) LOAD(OUTPUT:1, 100%) BodePlot lcv/bode_mag_to_grid.txt

BodePlot(OUTPUT:1)

  1. Resets Circuit to Steady-State
    1. Configures Input Sources to DC Sources, Loads to Resistive Loads
    2. Resets All Probe Configuration Properties to Empty Strings!
  2. Sets Load Subcircuit Type to Bode Load
  3. Sets Input Source to DC Source
  4. Adds Measurements to Source/Load
  5. Configures a POP+AC Analysis